The Clubhouse ProjectThe Railway Arches on Millwall ParkLast updated: 12th March 2008 PHOTOS BELOW. On this page is a selection of photos taken of the arches and the work that has been done. They are organised by the date on which they were taken. This page shows pictures taken on 12th March 2008 Click here to go back to the index page to see photos from other dates.
Re-stacking of bricks and blocks out of the way (inside the fire exit) making room for other area to be cleared.
Although it doesn't look much, the light is on in the toilet cubicle! The light switch for both cubicles is outside - could that come back to haunt someone?
The view from the toilet door, into the main area of Arch 2. Still a bit of a building site, but taking shape nicely.
A loft ladder has been installed to the upstairs area.
Sockets have been put in at strategic points around the room...
And strip lights with diffusers installed...
Even upstairs has lights now!
And, just inside the door between arch 1 and arch 2, the all-important switch to control the lights. |